A thematic Review on Industrialised Building System (IBS) Publications from 2015-2019: Analysis of Patterns and Trends for Future Studies of IBS in Malaysia

Mohd Zairul

Pertanika Journal of Social Science and Humanities, Volume 29, Issue 1, March 2021

DOI: https://doi.org/10.47836/pjssh.29.1.35

Keywords: ATLAS.ti 8, construction industry, IBS research, Industrialised Building System, thematic review

Published on: 26 March 2021

IBS has been theoretically and practically proven to improve the construction delivery apart from reducing the lead of time and cost throughout its supply chain. Under the Malaysian Construction Industry Transformation Programme (CITP) 2016-2020, it is stated that the government is accelerating the adoption of IBS through mechanisation and modern practices. Despite the government’s initiative, there have been relatively small amounts of materials published discussing the patterns in IBS publications in Malaysia and what the future holds for IBS. This paper explores a thematic review of the literature regarding new definitions and patterns that juxtaposes IBS in the construction industry in Malaysia from 2015 till 2019 by using the thematic review. The findings from the code-to-document analysis using ATLAS.ti 8 found that the patterns and trends on IBS from the year 2015 to 2019. This paper contributes to analysing the patterns and trends of IBS by identifying the thematic code within IBS publications for recommendations of future studies on IBS in Malaysia.

  • Aljawadi, A. S., Marsono, A. K., & Ismail, C. R. (2019). Ductility of reinforced concrete sub frame for Industrialized Building System. Jurnal Teknologi, 81(2), 1-9. https://doi.org/10.11113/jt.v81.11452

  • Amin, M. A. M., Abas, N. H., Shahidan, S., Rahmat, M. H., Suhaini, N. A., Nagapan, S., & Rahim, R. A. (2017). A review on the current issues and barriers of Industrialised Building System (IBS) adoption in Malaysia’s construction industry. IOP Conference Series: Materials Science and Engineering, 271(1), 012031. https://doi.org/10.1088/1757-899X/271/1/012031

  • Ariffin, H. L. T., Mohd, N. I., Mustaffa, N. E., Bandi, S., & Chee, C. H. M. (2019). Perspectives on issues and the application of the innovative procurement approaches for the Industrialised Building System (IBS). International Journal of Built Environment and Sustainability, 6(1), 39-43. https://doi.org/10.11113/ijbes.v6.n1.328

  • Ariffin, S. T., Yunus, R., Mohammad, H., & Yaman, S. K. (2017). A preliminary review on Economies of Scale (EOS) towards Industrialized Building System (IBS) manufacturer. MATEC Web of Conferences, 103, 03008. https://doi.org/10.1051/matecconf/201710303008

  • Aris, N. A. M., Fathi, M. S., Harun, A. N., & Mohamed, Z. (2019). Towards a sustainable supply of affordable housing with prefabrication technology: An overview. Journal of Advanced Research in Business and Management Studies, 15(1), 1-13.

  • Azman, N. S. S., Ramli, M. Z., & Zawawi, M. H. (2018). Factors affecting quality management of construction project using industrialized building system: A review. International Journal of Engineering and Technology (UAE), 7(4), 307-311. https://doi.org/10.14419/ijet.v7i4.35.22751

  • Benros, D., & Duarte, J. P. (2009). An integrated system for providing mass customized housing. Automation in Construction, 18(3), 310-320. https://doi.org/10.1016/j.autcon.2008.09.006

  • Chia, F. C., Skitmore, M., Runeson, G., & Bridge, A. (2012). An analysis of construction productivity in Malaysia. Construction Management and Economics, 30(12), 1055-1069. https://doi.org/10.1080/01446193.2012.711910

  • Clarke, V., & Braun, V. (2013). Teaching thematic analysis: Overcoming challenges and developing strategies for effective learning. The Psychologist, 26(2), 120-123.

  • Ern, P. A. S, Kasim, N., Hamid, Z. A., & Chen, G. K. (2017). Critical ICT-inhibiting factors on IBS production management processes in the Malaysia construction industry. IOP Conference Series: Materials Science and Engineering, 245(3), 032067. https://doi.org/10.1088/1757-899X/245/3/032067

  • Fateh, M. A. M., & Mohammad, F. M. (2017). IBS provision in local and international standard form of contracts. Journal of Construction in Developing Countries, 22(2), 1-12. https://doi.org/10.21315/jcdc2017.22.2.5

  • Fateh, M. A. M., Mohammad, M. F., & Shukor, A. S. A. (2017). Review in formulating the standard form of contract for Industrialized Building System (IBS) construction approach in Malaysia. MATEC Web of Conferences, 87, 01001. https://doi.org/10.1051/matecconf/20178701001

  • Fateh, M. A. M., Zakariah, H., & Ezanee, S. E. (2020). Improvement for significant clauses in the standard form of contract for industrialized building system construction. IOP Conference Series: Materials Science and Engineering, 713, 012037. https://doi.org/10.1088/1757-899x/713/1/012037

  • Fauzi, M. A., Hassan, S. H., Yunus, J. N., Sulaiman, H., & Hashim, M. Z. (2017). A feasibility study of Supply Chain Management (SCM) in Industrialized Building System (IBS) from contractor’s perspective: A case study. Journal of Engineering and Applied Sciences, 12(5 SI), 6916-6921. https://medwelljournals.com/abstract/?doi=jeasci.2017.6916.6921

  • Ghazali, M. A. A., Bahardin, N. F., Zaidi, M. A., Baharuddin, M. N., & Yusof, M. R. (2016). Literature mapping: Critical factors in industrialized building system plastic formwork application. International Review of Management and Marketing, 6(S7), 204-208.

  • Haron, N. A., Abdul-Rahman, H., Wang, C., & Wood, L. C. (2014). Quality function deployment modelling to enhance Industrialised Building System adoption in housing projects. Total Quality Management & Business Excellence, 26(7-8), 703-718. https://doi.org/10.1080/14783363.2014.880626

  • Ismail, S. (2018). Developing a framework for sustainable Industrialised Building Systems for infrastructure projects in Malaysia (Doctoral thesis). Queensland University of Technology.

  • Ismail, Z.-A. (2017). A case study of maintenance management systems in Malaysian complex and high-rise IBS buildings. Journal of Steel Structures & Construction, 3(2), 7650. https://doi.org/10.4172/2472-0437-C1-003

  • Ismail, Z.-A. (2018). An Integrated Computerised Maintenance Management System (I-CMMS) for IBS building maintenance. International Journal of Building Pathology and Adaptation, 37(3), 326-343. https://doi.org/10.1108/IJBPA-10-2017-0049

  • Ismail, Z.-A., Mutalib, A. A., & Hamzah, N. (2018). Improving contractor social networking on IBS infrastructure maintenance projects: A review. Engineering, Construction and Architectural Management, 25(4), 479-496. https://doi.org/10.1108/ECAM-08-2016-0180

  • Jabar, I. L., Ismail, F., & Aziz, A. R. A. (2015). Public participation: Enhancing public perception towards IBS implementation. Procedia - Social and Behavioral Sciences, 168, 61-69. https://doi.org/10.1016/j.sbspro.2014.10.210

  • Jin, T., Zhou, Z., Chang, W., & Huang, X. (2017). Man-made targets pose estimation using time-frequency distribution in UWB SAR. 2005 IEEE International Geoscience and Remote Sensing Symposium, 7(1), 4633-4635. https://doi.org/10.1109/IGARSS.2005.1526701

  • Jonsson, H., & Rudberg, M. (2014). Classification of production systems for industrialized building: A production strategy perspective. Construction Management and Economics, 32(1-2), 53-69. https://doi.org/10.1080/01446193.2013.812226

  • Kamaruddin, S. S., Mohammad, M. F., & Mahbub, R. (2018). IBS: An economic perspective on mechanisation and automation. Asian Journal of Quality of Life, 3(9), 87-98. https://doi.org/10.21834/ajqol.v3i9.80

  • Maniam, H., Nagapan, S., Abdullah, A. H., Subramaniam, S., & Sohu, S. (2018). A comparative study of construction waste generation rate based on different construction methods on construction project in Malaysia. Engineering Technology & Applied Science Research, 8(5), 3488-3491. https://doi.org/10.48084/etasr.2340

  • Marsono, A. K., Ying, W. J., Tap, M. M., Chieh, Y. C., & Haddadi, A. (2015). Standard verification test for Industrialised Building System (IBS) repetitive manufacturing. Procedia CIRP, 26, 252-257. https://doi.org/10.1016/j.procir.2014.07.047

  • Md. Ali, M., Abas, N. H., Affandi, H. M., & Abas, N. A. (2018). Factors impeding the Industrialized Building System (IBS) implementation of building construction in Malaysia. International Journal of Engineering & Technology, 7(4), 2209-2212. https://doi.org/10.14419/ijet.v7i4.17863

  • Mohammad, M. F., Baharin, A. S., Musa, M. F., & Yusof, M. R. (2016). The potential application of IBS modular system in the construction of housing scheme in Malaysia. Procedia - Social and Behavioral Sciences, 222, 75-82. https://doi.org/10.1016/j.sbspro.2016.05.189

  • Muhaidin, N. H. M., & Chan, H. B. (2018). The comparison of construction waste produced by conventional method against IBS: A case study in Pulau Pinang. AIP Conference Proceedings, 2020(1), 020055. https://doi.org/10.1063/1.5062681

  • Muhammad, W. M. N. W., Azman, M. A., Othman, M. K. F., Hadi, N. A., Sahimi, S. N. S., & Mohammad, M. F. (2016). The insight of Industrialised Building System (IBS) by Bumiputera construction players. MATEC Web of Conferences, 47, 04013. https://doi.org/10.1051/matecconf/20164704013

  • Musa, M. F., Mohammad, M. F., Mahbub, R., & Yusof, M. R. (2018). Adopting modular construction in the Malaysian construction industry. Asian Journal of Environment-Behaviour Studies, 3(10), 1-9. https://doi.org/10.21834/aje-bs.v3i10.307

  • Musa, M. F., Mohammad, M. F., Yusof, M. R., & Ahmad, R. (2016). Industrialised Building System Modular System (IBSMS) organisational readiness framework. Procedia - Social and Behavioral Sciences, 222, 83-92. https://doi.org/10.1016/j.sbspro.2016.05.191

  • Nasir, N. M., Nawi, M. N. M., Rahim, M. K. I. A., Bahaudin, A. Y., Tapa, A., Nasrun, M., Nawi, M. N. M., Kamarul, M., Abdul, I., & Bahaudin, A. Y. (2016). A review of delay factors in Malaysian Industrialized Building System (IBS) construction project. ARPN Journal of Engineering and Applied Sciences, 11(16), 9868-9873.

  • Nasrun, M., & Nawi, M. (2015). Barriers to implementation of the Industrialised Building System (IBS) in Malaysia. The Built & Human Environment Review, 4, 22-35.

  • Nawi, M. N. M., Anuar, H. S., & Lee, A. (2013). A review of IBS Malaysian current and future study. International Journal of Engineering Research & Technology, 2(10), 2378-2383.

  • Nawi, M. N. M., Lee, A., Mydin, M. A. O., Osman, W. N., & Rofie, M. K. (2018). Supply Chain Management (SCM): Disintegration team factors in Malaysian Industrialised Building System (IBS) construction projects. International Journal of Supply Chain Management, 7(1), 140-143.

  • Nawi, M. N. M., Mydin, M. A. O., Nifa, F. A. A., Osman, W. N., & Anuar, H. S. (2015). Malaysian Industrialised Building System (IBS): A review of studies. Australian Journal of Basic and Applied Sciences, 9(7), 99-101.

  • Nawi, M. N. M., Nasir, N. M., Azman, M. N. A., Jumintono, & Khairudin, M. (2019). Investigating factors of delay in IBS construction project: Manufacturer perspectives. Journal of Engineering Science and Technology, (Special Issue on ICEES2018), 59-66.

  • Noguchi, M. (2003). The effect of the quality-oriented production approach on the delivery of prefabricated homes in Japan. Journal of Housing and the Built Environment, 18, 353-364. https://doi.org/10.1023/B:JOHO.0000005759.07212.00

  • Noor, S. R. M., Yunus, R., Abdullah, A. H., Nagapan, S., & Mazlan, S. M. S. S. (2018). Insights into the adoption of lean management in Industrialised Building System (IBS) implementation: The drivers and challenges. International Journal of Engineering and Technology (UAE), 7(3.23), 22-31. https://doi.org/10.14419/ijet.v7i3.23.17253

  • Othman, M. K. F., Muhammad, W. M. N. W., Hadi, N. A., & Azman, M. A. (2017). The significance of coordination for Industrialised Building System (IBS) precast concrete in construction industry. MATEC Web of Conferences, 103, 03004. https://doi.org/10.1051/matecconf/201710303004

  • Piroozfar, P., Altan, H., & Popovic-Larsen, O. (2012). Design for sustainability: A comparative study of a customized modern method of construction versus conventional methods of construction. Architectural Engineering and Design Management, 8(1), 55-75. https://doi.org/10.1080/17452007.2012.650935

  • Pozin, M. A. A., & Nawi, M. N. M. (2018). Effective of communication using WhatsApp: Industrialised Building System (IBS) construction. AIP Conference Proceedings, 2016(1), 020018. https://doi.org/10.1063/1.5055420

  • Rashidi, A., & Ibrahim, R. (2017). Industrialized construction chronology: The disputes and success factors for a resilient construction industry in Malaysia. The Open Construction and Building Technology Journal, 11(1), 286-300. https://doi.org/10.2174/1874836801711010286

  • Razak, F. M., & Awang, H. (2014). The contractors’ perception of the implementation of Industrialised Building System (IBS) in Malaysia. MATEC Web of Conferences, 10, 04003. https://doi.org/10.1051/matecconf/20141004003

  • Shamsuddin, S. M., Zakaria, R., Hashim, N., Mohamad Yusuwan, N., Sahamir, S. R., & Abidin, N. I. (2017). A framework of initiatives for successful application of life cycle costing (LCC) in Industrialised Building System (IBS) in Malaysian construction industry. MATEC Web of Conferences, 138, 05002. https://doi.org/10.1051/matecconf/201713805002

  • Shamsuddin, S. M., Zakaria, R., & Mohamed, S. F. (2018). Economic attributes related to Industrialised Building System in Malaysia. Asian Journal of Behavioural Studies, 3(11), 65-73. https://doi.org/10.21834/ajbes.v3i11.102

  • Shamsuddin, S. M., Zakaria, R., Mohamed, S. F., Saleh, A. L., Utomo, C., Majid, M. Z. A., & Yahya, K. (2015). Developing methodology for cradle to grave cost planning for Industrialised Building System (IBS) in Malaysia. Jurnal Teknologi, 77(16), 37-42. https://doi.org/10.11113/jt.v77.6397

  • Waris, M., Liew, M. S., Faris, M., & Idrus, A. (2015). An exploratory study on enablers and barriers for onsite mechanisation in the Malaysian construction industry. Malaysian Construction Research Journal, 16(1), 15-30.

  • Waris, M., Liew, M. S., Khamidi, M. F., & Idrus, A. (2014). Investigating the awareness of onsite mechanization in Malaysian construction industry. Procedia Engineering, 77, 205-212. https://doi.org/10.1016/j.proeng.2014.07.018

  • Wen, T. J., Siong, H. C., & Noor, Z. Z. (2015). Assessment of embodied energy and global warming potential of building construction using life cycle analysis approach: Case studies of residential buildings in Iskandar Malaysia. Energy and Buildings, 93, 295-302. https://doi.org/10.1016/j.enbuild.2014.12.002

  • Yunus, R., Abdullah, A. H., Yasin, M. N., Masrom, M. A. N., & Hanipah, M. H. (2016). Examining performance of Industrialized Building System (IBS) implementation based on contractor satisfaction assessment. ARPN Journal of Engineering and Applied Sciences, 11(6), 3776-3782.

  • Yunus, R., Noor, S. R. M., Abdullah, A. H., Nagapan, S., Hamid, A. R. A., Tajudin, S. A. A., & Jusof, S. R. M. (2017). Critical success factors for lean thinking in the application of Industrialised Building System (IBS). IOP Conference Series: Materials Science and tableEngineering, 226, 012045. https://doi.org/10.1088/1757-899X/226/1/012045

  • Zairul, M. (2017). FlexZhouse: A new business model for affordable housing in Malaysia. In A+BE architecture and the built environment (Vol. 2, Issue 2). https://doi.org/10.7480/abe.2017.2

  • Zairul, M. (2020). A thematic review on student-centred learning in the studio education. Journal of Critical Reviews, 7(2), 504-511. https://doi.org/10.31838/jcr.07.02.95

ISSN 0128-7702

e-ISSN 2231-8534

Article ID

JSSH-5291-2019

Download Full Article PDF

Share this article

Recent Articles