Home / Regular Issue / JTAS Vol. 25 (S) May. 2017 / JST-0250-2016

 

Risk Factors for Design and Build Projects in Malaysia - Project Manager's Perception

Sabihah Saaidin, Intan Rohani Endut, Siti Akmar Abu Samah and Ahmad Ruslan Mohd Ridzuan

Pertanika Journal of Tropical Agricultural Science, Volume 25, Issue S, May 2017

Keywords: Design and build, project manager, risk factor

Published on: 01 Nov 2017

The design and build concept has become a popular contract system. It requires the owner and contractor to identify, analyse and manage risks and search for the best solutions to improve performance. The objective of this paper is to identify the project manager's perception of risk factors associated with the design and build project in Malaysia. A total of 100 usable questionnaires were received and analysed using mean ranking and factor analysis. The results show that three most risky factors are: "client financial capability", "inadequate cash flow by contractor", and "lack of payment (delayed progress payment by owner to the contractor)". Risk can be grouped into 12 categories, namely: (1) lack of management competency; (2) lack of contractor experience; (3) political issues; (4) lack of standardized system; (5) unpredictable issues; (6) lack of client experience; (7) safety issues; (8) lack of teamwork; (9) poor supervision by client; (10) lack of client information; (11) material availability; and (12) design error.

ISSN 1511-3701

e-ISSN 2231-8542

Article ID

JST-0250-2016

Download Full Article PDF

Share this article

Recent Articles